<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	 xmlns:media="http://search.yahoo.com/mrss/" >

<channel>
	<title>Installations &#8211; Catering Centre</title>
	<atom:link href="https://www.cateringcentre.co.uk/product-tag/installations/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.cateringcentre.co.uk</link>
	<description>by Restaurant Projects</description>
	<lastBuildDate>Sun, 17 Aug 2025 05:36:41 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://www.cateringcentre.co.uk/wp-content/uploads/2021/01/cc-icon-new-100x100.png</url>
	<title>Installations &#8211; Catering Centre</title>
	<link>https://www.cateringcentre.co.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Hardwired Triple Tank Freestanding Fryer Installation</title>
		<link>https://www.cateringcentre.co.uk/product/hardwired-triple-tank-freestanding-fryer-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/hardwired-triple-tank-freestanding-fryer-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 09 Aug 2024 18:48:30 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/hardwired-triple-tank-freestanding-fryer-installation/</guid>

					<description><![CDATA[Installation, commisioning and testing of a hardwired triple tank fryer ]]></description>
										<content:encoded><![CDATA[<p>Hardwired Triple Tank Freestanding Fryer Installation</p>
<p>Installation by a qualified service provider for your new fryer. Installation includes connection to existing services.</p>
<p>Installations</p>
<p>Installations</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/hardwired-triple-tank-freestanding-fryer-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Wall Mounted Plug In Water Boiler Installation</title>
		<link>https://www.cateringcentre.co.uk/product/wall-mounted-plug-in-water-boiler-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/wall-mounted-plug-in-water-boiler-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 20:00:11 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/wall-mounted-plug-in-water-boiler-installation/</guid>

					<description><![CDATA[Installation for a wall mounted water connection for a 13 Amp plugged water boiler Wallmounted Plug In Water Boiler Installation (Direct)]]></description>
										<content:encoded><![CDATA[<p>Wall Mounted Plug In Water Boiler Installation</p>
<p>Professional installation by a qualified service provider for a 13 Amp wall mounted plugged water boiler. Installation includes siting of the product, mounting product to suitable wall and plumbing in to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.</p>
<ul>
<li>This installation offer requires a 13 Amp plug socket within 1 metre of proposed siting of water boiler, as well as a suitable wall area for unit to be mounted to</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>A plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler</li>
<li>The services for any wall mounted water boilers must be easily accessible. The installation does not include cutting through any work surfaces to run services from beneath</li>
<li>Please check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation &#8211; please call for further information</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/wall-mounted-plug-in-water-boiler-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Hardwired Pasta Cooker (Auto Fill) installation</title>
		<link>https://www.cateringcentre.co.uk/product/hardwired-pasta-cooker-auto-fill-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/hardwired-pasta-cooker-auto-fill-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 19:59:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/hardwired-pasta-cooker-auto-fill-installation/</guid>

					<description><![CDATA[Installation, commissioning and testing of a hardwired Hardwired Pasta Cooker (Auto Fill) Installation (Direct)]]></description>
										<content:encoded><![CDATA[<p>Hardwired Pasta Cooker (Auto Fill) installation</p>
<p>Installation by a qualified service provider for your new Pasta Cooker. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services</p>
<ul>
<li>1 single phase or 1 three phase (dictated by appliance voltage in specifications) standard approved isolator switch , junction box or commando socket ( grey/blue single phase or grey/red three phase) protected by a suitably rated circuit breaker (dictated by appliance kilowatt rating in appliance specifications) along with a water supply terminated with a washing machine type &#190;¿ isolator valve will be required within 1 metre of the proposed appliance siting</li>
<li>Installation work carries a warranty period of 7 days unless there are exceptional circumstances.</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>Labour to install, commission and test 1.5 Hours</li>
<li>Services must be easily accessible.  The installation does not include cutting through any work surfaces/walls to run services through</li>
<li>Customers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/hardwired-pasta-cooker-auto-fill-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Wall Mounted Hardwired Water Boiler Installation</title>
		<link>https://www.cateringcentre.co.uk/product/wall-mounted-hardwired-water-boiler-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/wall-mounted-hardwired-water-boiler-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 19:59:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/wall-mounted-hardwired-water-boiler-installation/</guid>

					<description><![CDATA[Installation for a wall mounted water connection for a water boiler with such power that it requires hard wiring (e.g. single phase 16amp) Wallmounted Hardwired Water Boiler Installation (Direct)]]></description>
										<content:encoded><![CDATA[<p>Wall Mounted Hardwired Water Boiler Installation</p>
<p>Professional installation by a qualified service provider for a hardwired wall mounted water boiler. Installation includes siting of the product, mounting product to suitable wall, connection to existing electrical supply and plumbing in to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.</p>
<ul>
<li>This installation requires power source with a industry approved electrical isolator socket or junction box within 1 metre of proposed siting of water boiler</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>A plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler</li>
<li>The services for any wall mounted water boilers must be easily accessible. The installation does not include cutting through any work surfaces to run services from beneath</li>
<li>Please check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation &#8211; please call for further information</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/wall-mounted-hardwired-water-boiler-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Under Counter Water Boiler Installation</title>
		<link>https://www.cateringcentre.co.uk/product/under-counter-water-boiler-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/under-counter-water-boiler-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 19:59:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/under-counter-water-boiler-installation/</guid>

					<description><![CDATA[Installation for an under counter water connection for a 13 Amp plugged water boiler Undercounter Water Boiler Installation (Direct)]]></description>
										<content:encoded><![CDATA[<p>Under Counter Water Boiler Installation</p>
<p>Professional installation by a qualified service provider for an undercounter 13 Amp plugged water boiler. Installation includes siting of the product and plumbing in to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.</p>
<ul>
<li>This installation requires a 13 Amp plug socket within 1 metre of proposed siting of the water boiler. Access through the worktop into the under counter siting of the boiler is also required</li>
<li>Please check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation &#8211; please call for further information</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>Due to the wide variety of materials used for counters, it is recommended that any access holes are pre-cut before installation is arranged</li>
<li>A plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler</li>
<li>The services for any under counter boilers must be easily accessible</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/under-counter-water-boiler-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Premium Undercounter Warewashing Machine Installation</title>
		<link>https://www.cateringcentre.co.uk/product/premium-undercounter-warewashing-machine-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/premium-undercounter-warewashing-machine-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 19:59:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/premium-undercounter-warewashing-machine-installation/</guid>

					<description><![CDATA[Installation, commissioning and testing of a premium undercounter warewashing machine Premium Undercounter Warewashing Installation &#038; Phone Survey (Direct)]]></description>
										<content:encoded><![CDATA[<p>Premium Undercounter Warewashing Machine Installation</p>
<p>Installation by a qualified service provider for your new dishwasher/glasswasher. Installation includes connection to existing services, commissioning and testing.</p>
<ul>
<li>An industry approved electrical connection point, water supply and drainage of sufficient specification, as indicated in the appliance technical info, must be available within 1 metre of the appliance siting</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>Labour to install, commission and test 2-3 hours</li>
<li>Services must be easily accessible.  The installation does not include cutting through any work surfaces/walls to run services through</li>
<li>Installation work carries a warranty period of 7 days unless there are exceptional circumstances</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/premium-undercounter-warewashing-machine-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Potato Peeler/Rumbler installation</title>
		<link>https://www.cateringcentre.co.uk/product/potato-peeler-rumbler-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/potato-peeler-rumbler-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 19:59:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/potato-peeler-rumbler-installation/</guid>

					<description><![CDATA[Installation, commissioning and testing of a hardwired Potato Peeler/Rumbler Installation (Direct)]]></description>
										<content:encoded><![CDATA[<p>Potato Peeler/Rumbler installation</p>
<p>Installation by a qualified service provider for your new Potato Peeler or Rumbler. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services</p>
<ul>
<li>A single phase industry approved isolator switch, junction box or commando socket(grey/blue) protected by a suitably rated circuit breaker(dictated by kilowatt rating in appliance specifications) along with a water supply terminated with a &#190;¿bsp washing machine type isolator valve will be required within 1 metre of the proposed appliance siting. There are various drain options from draining into a sink or bucket to solid piped into the service drain available dependant upon manufacturer and model.</li>
<li>Installation work carries a warranty period of 7 days unless there are exceptional circumstances.</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>Labour to install, commission and test 2 Hours</li>
<li>Services must be easily accessible.  The installation does not include cutting through any work surfaces/walls to run services through</li>
<li>Customers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/potato-peeler-rumbler-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Pass Through Dishwasher Site Survey and Installation</title>
		<link>https://www.cateringcentre.co.uk/product/pass-through-dishwasher-site-survey-and-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/pass-through-dishwasher-site-survey-and-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 19:59:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/pass-through-dishwasher-site-survey-and-installation/</guid>

					<description><![CDATA[Site survey, installation, commissioning and testing of a pass through warewashing machine Passthrough Warewashing Installation &#038; Site Survey (Direct)]]></description>
										<content:encoded><![CDATA[<p>Pass Through Dishwasher Site Survey and Installation</p>
<p>Installation by a qualified service provider for your new dishwasher. Installation includes connection to existing services, commissioning and testing.</p>
<ul>
<li>An industry approved electrical connection point, water supply and drainage of sufficient specification, as indicated in the appliance technical info, must be available within 1 metre of the appliance siting</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>Labour to install, commission and test 3-4 hours</li>
<li>Services must be easily accessible.  The installation does not include cutting through any work surfaces/walls to run services through</li>
<li>Installation work carries a warranty period of 7 days unless there are exceptional circumstances</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/pass-through-dishwasher-site-survey-and-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Hardwired twin tank freestanding fryer installation</title>
		<link>https://www.cateringcentre.co.uk/product/hardwired-twin-tank-freestanding-fryer-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/hardwired-twin-tank-freestanding-fryer-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 19:59:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/hardwired-twin-tank-freestanding-fryer-installation/</guid>

					<description><![CDATA[Installation, commissioning and testing of a hardwired Hardwired Twin Tank Freestanding Fryer Installation (Direct)]]></description>
										<content:encoded><![CDATA[<p>Hardwired twin tank freestanding fryer installation</p>
<p>Installation by a qualified service provider for your new Fryer. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services</p>
<ul>
<li>2 single phase or 2 three phase (dictated by fryer voltage in specifications) standard approved isolator switches , junction boxes or commando sockets ( grey/blue single phase or grey/red three phase) protected by suitably rated circuit breakers (dictated by fryer kilowatt rating in fryer specifications) will be required within 1 metre of the proposed fryer siting</li>
<li>Installation work carries a warranty period of 7 days unless there are exceptional circumstances.</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>Labour to install, commission and test 2 Hours</li>
<li>Services must be easily accessible.  The installation does not include cutting through any work surfaces/walls to run services through</li>
<li>Customers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/hardwired-twin-tank-freestanding-fryer-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Hardwired single tank freestanding fryer installation</title>
		<link>https://www.cateringcentre.co.uk/product/hardwired-single-tank-freestanding-fryer-installation/</link>
					<comments>https://www.cateringcentre.co.uk/product/hardwired-single-tank-freestanding-fryer-installation/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 25 Sep 2022 19:59:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.cateringcentre.co.uk/product/hardwired-single-tank-freestanding-fryer-installation/</guid>

					<description><![CDATA[Installation, commissioning and testing of a hardwired single tank freestanding fryer Hardwired Single Tank Freestanding Fryer Installation (Direct)]]></description>
										<content:encoded><![CDATA[<p>Hardwired single tank freestanding fryer installation</p>
<p>Installation by a qualified service provider for your new fryer. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services</p>
<ul>
<li>1 single phase or 1 three phase (dictated by fryer voltage in specifications) standard approved isolator switch , junction box or commando socket ( grey/blue single phase or grey/red three phase) protected by a suitably rated circuit breaker (dictated by fryer kilowatt rating in fryer specifications) will be required within 1 metre of the proposed fryer siting</li>
<li>Installation work carries a warranty period of 7 days unless there are exceptional circumstances.</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>0</li>
<li>Labour to install, commission and test 1.5 Hours</li>
<li>Services must be easily accessible.  The installation does not include cutting through any work surfaces/walls to run services through</li>
<li>Customers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://www.cateringcentre.co.uk/product/hardwired-single-tank-freestanding-fryer-installation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: www.cateringcentre.co.uk @ 2026-06-16 22:19:46 by W3 Total Cache
-->